Project Overview
RDI completed a 90 linear foot wall installation for a regional credit union as part of a new construction project. The installation required coordination with multiple trades and adherence to site-specific safety protocols.
Scope of Work
- Installation of 90 linear feet of wall system
- Product specified: Allsteel & MBI
- Direct-to-site delivery
- Second-story material lift and coordination
- Union-trained installation crew
Project Approach
This project required precise coordination from the start.
The wall system was shipped directly to the job site, eliminating warehouse staging but increasing the importance of on-site sequencing and trade coordination.
Materials were lifted to the second story, requiring:
- Communication with other trades
- Clear access scheduling
- Controlled staging within the building
- Strict adherence to site safety protocols
Our union-trained crews ensured the installation met both structural and manufacturer specifications while maintaining jobsite efficiency.
Safety & Compliance
New construction environments require flexibility and preparedness.
RDI crews are:
- Union trained
- Safety certified
- Equipped with required PPE
- Experienced working alongside multiple trades
This ensures we can integrate seamlessly into active construction sites without disrupting overall project flow.
Result
The wall installation was completed efficiently and in alignment with site coordination requirements.
Projects like this highlight the importance of:
- Skilled labor
- Trade coordination
- On-site communication
- Safety-first execution
At RDI, we understand that wall installation in new construction environments demands more than manpower — it requires planning, training, and accountability.